ReportWire

Tag: space

  • FAA recommends 44 launches per year for SpaceX’s Starship

    [ad_1]

    CAPE CANAVERAL SPACE FORCE STATION — SpaceX passed another milestone in its effort to bring its Super Heavy Starship rocket to the Space Coast.


    What You Need To Know

    • The report recommended that SpaceX could pursue up to 44 launches per year from Kennedy Space Center
    • This also includes 88 landings, 44 for Starship and 44 for the Super Heavy rocket booster
    • Super Heavy is the rocket booster part of the vehicle; the spacecraft is called Starship

    On Friday, the FAA released a 444-page “Record of Decision” on a final environmental impact statement.

    The report recommended that SpaceX could pursue up to 44 launches per year from Kennedy Space Center. This also includes 88 landings, 44 for Starship and 44 for the Super Heavy rocket booster.

    The agency previously released an environmental impact statement to allow up to 76 launches from Cape Canaveral Space Force Station.

    SpaceX would still need to complete mitigation work and get approval for a launch license from the FAA before those launches could begin.

    Some residents have voiced concerns about beach access or noise related to the launches.

    The agency acknowledged impacts on commercial flights, in particular, international flights, due to the need for ground stops and re-routing.

    The FAA also considered that launches could cost the National Parks Service revenue due to required closures of parts of the Canaveral National Seashore.

    And that sonic booms could expose some Brevard County residents to noise during late-night operations, but still stuck with the recommendations to approve.

    [ad_2]

    Spectrum News Staff

    Source link

  • Students studying about the next mission to the moon, history of flight

    [ad_1]

    BREVARD COUNTY, Fla. — All eyes are on the upcoming Artemis II mission to the moon because America hasn’t been to the moon in more than 50 years, and some Brevard County students are following along and learning about the history of flight.


    What You Need To Know

    • Some Viera Middle School students are learning about the history and future of flight
    • They are part of a program created through a partnership between FlightWorks Alabama and Airbus U.S. Space and Defense 
    • Some students are building model airplanes, and others are building their own space capsules
    • Teachers are helping the students understand the importance of developing a talent pipeline for future engineers and aviators

    The students learned Friday that NASA delayed a key test, the wet dress rehearsal, because of expected cold temperatures. The wet dress rehearsal, a simulated launch day for the team and the fueling of the rocket to check for issues before the real liftoff, is now scheduled for Monday, Feb. 2, with a potential launch on Sunday, Feb. 8.

    In one classroom at Viera Middle School, students are studying the dawn of aviation.

    It all began when the Wright brothers took flight in Kitty Hawk, N.C. in December 1903. Their Wright Flyer was the first to achieve sustained, powered and controlled flight.

    Those students are building their own model planes.

    Seventh-grader Olivia Toler and her peers are cutting, sticking and gluing their models as part of the We Build it Better program, which was created through a partnership involving Airbus U.S. Space and Defense.

    It has reached 600,000 students in classrooms across the United States, United Kingdom and France and was created to help students like Toler understand the importance of developing a talent pipeline for future engineers and aviators.

    “Something like in the field of aerospace and launching rockets,” Toler said about a potential career.

    Down the hall in Lynn Dotson’s class, her students are focused on the future of flight.

    Every Friday in her classroom, it’s Artemis “Fri-yay,” where students learn something new about the moon mission.

    This time, it’s all about the Orion capsule, which will take the four-person crew to the moon.

    Liam Stevens and his friends built their own capsules out of plastic and Styrofoam cups.

    They put chocolate on the inside and are applying gradual heat to test the strength of the mock heat shield.

    “Testing it, seeing what’s wrong and trying to fix it,” Stevens explained.

    Dotson took time away from teaching in schools to be an educator at NASA. Now she’s back in the classroom mentoring future engineers — maybe even preparing them for spaceflight.

    “What if they become astronauts?” Dotson said, smiling.

    She said she is excited her students are immersing themselves in studying Artemis.

    “How cool would that be? I could be the one that inspired them — and the other teachers here. That’s our job,” Dotson said. “We are inspiring the next generation.” 

    [ad_2]

    Greg Pallone

    Source link

  • Blue Origin puts a pause on New Shepard launches to focus on the moon

    [ad_1]

    NATIONWIDE— Space will not be a destination for paying customers for a while, at least not through Blue Origin.


    What You Need To Know

    • Blue Origin stated it wants to focus on its “lunar capabilities”
    • NASA has tapped Blue Origin and other companies for the Artemis III mission

    The company announced Friday that it would pause its reusable New Shepard rocket flights for at least two years.

    Those are the ones that sent passengers, including Katy Perry, Gayle King, Jeff Bezos, Michael Strahan, and William Shatner, above the Kármán line to experience weightlessness.

    The majority of the passengers have not been celebrities who went beyond the line to the edge of space, at 62 miles/100 kilometers above the planet’s surface.

    Blue Origin had run more than a dozen of those flights, with the most recent one having lifted off just over a week ago, on Jan. 22.

    The company stated it will shift resources to accelerate its “lunar capabilities.”

    “Blue Origin today announced it will pause its New Shepard flights and shift resources to further accelerate development of the company’s human lunar capabilities. The decision reflects Blue Origin’s commitment to the nation’s goal of returning to the Moon and establishing a permanent, sustained lunar presence,” stated Brett Griffin, director of Blue Origin’s public relations.

    In October 2025, then NASA acting Administrator Sean Duffy said the U.S. space agency is considering Blue Origin and other companies to handle the task of returning humans to the moon’s surface because SpaceX’s Starship was behind schedule.

    “Now, SpaceX had the contract for Artemis III. By the way, I love SpaceX and it’s an amazing company, but the problem is, they are behind. They pushed their timelines out and we are in a race against China. The president and I want to get to the moon in this president’s term. So, I’m going to open up the contract and I’m going let other space companies compete with SpaceX, like Blue Origin. Whatever one gets us there first to the moon, we are going to take. If SpaceX is behind and Blue Origin can do it before them, good on Blue Origin,” he wrote on X at the time.

    During a September 2025 media tour of Blue Origin’s New Glenn rocket facility in Florida, Spectrum News asked U.S. Rep. Mike Haridopolos, who is the chairman of the U.S. Space and Aeronautics Subcommittee, if NASA had any backup plans if Starship was behind schedule.

    He only said that the only focus at that time was Artemis II, which will see four astronauts flyby the moon in NASA’s Space Launch System rocket and the Orion spacecraft.

    Blue Origin’s Blue Moon Mark 1 lunar lander is set to have an uncrewed launch to land on the moon sometime in 2026, and the Blue Moon Mark 2 lunar lander will be taking humans back to the moon’s surface for the Artemis V mission.

    [ad_2]

    Spectrum News Staff, Anthony Leone

    Source link

  • Ray Kappe’s Modernist masterpiece asks $11.5 million in Pacific Palisades

    [ad_1]

    An iconic property that has been described as possibly “the greatest house in Southern California” just hit the market for the first time ever in Pacific Palisades. Asking price: $11.5 million.

    A Midcentury masterpiece, the home served as the primary residence of Ray Kappe, the late architect who co-founded the Southern California Institute of Architecture (SCI-Arc). He designed the place himself in 1967.

    Kappe died in 2019, and his wife Shelly, who also co-founded SCI-Arc, died last year. Now, the property is being sold by their family trust.

    Tucked on a hillside in the Rustic Canyon neighborhood, the house floats above a natural spring that flows through the property, resting on six concrete columns sunk 30 feet into the ground. The 4,157-square-foot floor plan is split across seven levels, featuring five bedrooms, five bathrooms and free-flowing living spaces wrapped in redwood and glass.

    One critic called it “a controlled explosion of space.” An architect called it “the quintessential treehouse.” In 2008, when the L.A. Times Home section created a list of the 10 best houses in L.A., which featured creations from Richard Neutra, Frank Lloyd Wright and Pierre Koenig, former American Institute of Architects’ L.A. chapter president Stephen Kanner said Kappe’s “may be the greatest house in Southern California.”

    The 1960s home floats on a hillside lot in Rustic Canyon.

    (Cameron Carothers)

    It’s not a house that could be built today — for a handful of reasons. First, the hovering stairs and footbridges that navigate the property have no handrails, which are now required under current construction code.

    Also, the house features a ton of glass. Too much glass, according to modern California building code. The home’s skylights, clerestories and towering windows that take in the wooded scene surrounding it make up roughly 50% of the floor plan — much higher than modern limits allow.

    Outside, cantilevered decks and platforms overlook a lap pool, spa, sauna and cabana shrouded in eucalyptus, sycamore, oak and bamboo.

    The 4,157-square-foot house is wrapped in concrete, redwood and glass.

    The 4,157-square-foot house is wrapped in concrete, redwood and glass.

    (Cameron Carothers)

    The end result is a striking space that feels entirely unique, even in a region as architecturally eclectic as Southern California. In 1996, it was deemed an L.A. Historic-Cultural Monument.

    Ian Brooks of Berkshire Hathaway HomeServices California Properties holds the listing. He said calls asking to tour the property have been coming nonstop since it surfaced for sale.

    “The Kappe residence will resonate with discerning buyers who value architectural provenance, impeccable design and cultural importance — a rare opportunity to own an enduring piece of architectural history,” he said.

    [ad_2]

    Jack Flemming

    Source link

  • SpaceX hits milestone with more than 11,000 Starlink launches

    [ad_1]

    CAPE CANAVERAL SPACE FORCE STATION — You might want to grab a light coat if you plan on staying up late to watch SpaceX launch nearly 30 Starlink satellites very early Friday morning.

    And more than 11,000 Starlink satellites have been launched. 


    What You Need To Know

    • More than 11,000 Starlink satellites have been launched since 2019

    The Falcon 9 rocket will send up Starlink 6-101 mission from Space Launch Complex 40 at Cape Canaveral Space Force Station, stated SpaceX.

    The launch window will open at 11 p.m. ET, Thursday, and remain open until 3 a.m. ET, Friday, which means SpaceX has during that time period to send up its Falcon 9.

    Currently, the liftoff time is 12:51 a.m ET, Friday. It was set for a Friday launch at 11:01 p.m. ET and then 11:24 p.m. ET. No word on why the liftoff time was pushed back.

    The 45th Weather Squadron gave a 95% chance of good liftoff conditions, with the only concern being the thick cloud layers rule.

    Find out more about the weather criteria for a Falcon 9 launch.

    Going up

    This is only the fifth mission for the Falcon 9’s first-stage booster and all four of its missions have been Starlink launches.

    After the stage separation, the first-stage rocket will land on the droneship Just Read the Instructions that will be in the Atlantic Ocean.

    About the mission

    The 29 satellites from the Starlink company, owned by SpaceX, will be heading to low-Earth orbit to join the thousands already there.

    Once deployed and in their orbit, they will provide internet service to many parts of Earth.

    And we do mean thousands. Dr. Jonathan McDowell, of Harvard-Smithsonian Center for Astrophysics, has been recording Starlink satellites and their launches.

    And according to his records, there have been 11,034 Starlink satellites that have been launched since the very first batch in 2019.

    But not all of them are fully operational. Or at all. Some are no longer in working order because of age, technical mishaps, or being directed to burn up in the Earth’s atmosphere.

    Before this launch, McDowell recorded the following:

    • 9,573 are in orbit
    • 8,297 are in operational orbit

    [ad_2]

    Anthony Leone

    Source link

  • Central Florida man reflects on Challenger disaster 40 years later

    [ad_1]

    ORANGE CITY, Fla. — Wednesday marks the 40th anniversary of one of the darkest days for NASA — the Space Shuttle Challenger disaster.

    All seven astronauts on board were killed when the shuttle broke apart 73 seconds after lifting off from Kennedy Space Center on Jan. 28, 1986. 


    What You Need To Know

    • Wednesday marks 40 years since the Space Shuttle Challenger disaster on Jan. 28, 1986
    • Just over a minute after lifting off, the Challenger broke apart, killing all seven astronauts on board
    • Volusia County resident and space enthusiast Jeffrey Ault, who captured it all on his Super 8 camera, says he remembers the tragedy like it was yesterday


    Many people across Florida and the country watched as it all unfolded, including Volusia County resident Jeffrey Ault, who says he remembers that day like it was yesterday.

    Ault was one of many on the shoreline of the Banana River near Port Canaveral who were watching the launch live that day.

    He says he was the only person to have shot it all on a Super 8 movie camera.

    Although Ault says it was a memorable January day, it was for all the wrong reasons.

    Challenger crew members: Michael J. Smith, front row left, Francis R. “Dick” Scobee, Ronald E. McNair; Ellison S. Onizuka, back row left, S. Christa McAuliffe, Gregory B. Jarvis, and Judith A. Resnik. On Jan. 28, 1986, they lost their lives when the space shuttle Challenger blew up after liftoff. (NASA)

    Like many space enthusiasts, Ault says he followed the Apollo program and built rocket models ever since he was a kid. So, to witness a tragedy like the Challenger explosion was devastating for him.

    It was also his first time seeing a launch in person. 

    One thing that Ault says he remembers very clearly is how cold it was that day.

    He says the launch had been delayed several times because of weather concerns, and that he didn’t know whether it was going to happen.

    Even though the Challenger launch resulted in tragedy, Ault says a lot still can be learned from it to this day.

    “I think the space program — back with the Apollo program, the Space Shuttle program — brought Americans together, brought people from all over the world together,” he says. “And hopefully, as we move forward, maybe we could get some of that unity and positive feeling back throughout this country.”

    Ault says he will never forget the speech that then-President Ronald Reagan made in honor of those who died in the tragedy, and to remind Americans what astronauts put on the line every time they go into space.

    “You really have to give credit to the masterminds, the engineers who work on this, and then the brave astronauts that are putting their lives at risk for this travel,” Ault says. “And the Challenger taught us that it is very dangerous.”

    To keep their memories alive, the NASA Day of Remembrance ceremony is held every year around the time of the Challenger disaster. This year, it took place on Jan. 22.

    The event serves to memorialize the lives lost not only in the Challenger tragedy, but the seven astronauts who died aboard the Space Shuttle Columbia, which broke up during re-entry on Feb. 1, 2003, and the three astronauts from Apollo 1, who died when a fire broke out in their capsule during preflight testing on Jan. 27, 1967.

    [ad_2]

    Sasha Teman

    Source link

  • Central Florida man reflects on Challenger disaster 40 years later

    [ad_1]

    ORANGE CITY, Fla. — Wednesday marks the 40th anniversary of one of the darkest days for NASA — the Space Shuttle Challenger disaster.

    All seven astronauts on board were killed when the shuttle broke apart 73 seconds after lifting off from Kennedy Space Center on Jan. 28, 1986. 


    What You Need To Know

    • Wednesday marks 40 years since the Space Shuttle Challenger disaster on Jan. 28, 1986
    • Just over a minute after lifting off, the Challenger broke apart, killing all seven astronauts on board
    • Volusia County resident and space enthusiast Jeffrey Ault, who captured it all on his Super 8 camera, says he remembers the tragedy like it was yesterday


    Many people across Florida and the country watched as it all unfolded, including Volusia County resident Jeffrey Ault, who says he remembers that day like it was yesterday.

    Ault was one of many on the shoreline of the Banana River near Port Canaveral who were watching the launch live that day.

    He says he was the only person to have shot it all on a Super 8 movie camera.

    Although Ault says it was a memorable January day, it was for all the wrong reasons.

    Challenger crew members: Michael J. Smith, front row left, Francis R. “Dick” Scobee, Ronald E. McNair; Ellison S. Onizuka, back row left, S. Christa McAuliffe, Gregory B. Jarvis, and Judith A. Resnik. On Jan. 28, 1986, they lost their lives when the space shuttle Challenger blew up after liftoff. (NASA)

    Like many space enthusiasts, Ault says he followed the Apollo program and built rocket models ever since he was a kid. So, to witness a tragedy like the Challenger explosion was devastating for him.

    It was also his first time seeing a launch in person. 

    One thing that Ault says he remembers very clearly is how cold it was that day.

    He says the launch had been delayed several times because of weather concerns, and that he didn’t know whether it was going to happen.

    Even though the Challenger launch resulted in tragedy, Ault says a lot still can be learned from it to this day.

    “I think the space program — back with the Apollo program, the Space Shuttle program — brought Americans together, brought people from all over the world together,” he says. “And hopefully, as we move forward, maybe we could get some of that unity and positive feeling back throughout this country.”

    Ault says he will never forget the speech that then-President Ronald Reagan made in honor of those who died in the tragedy, and to remind Americans what astronauts put on the line every time they go into space.

    “You really have to give credit to the masterminds, the engineers who work on this, and then the brave astronauts that are putting their lives at risk for this travel,” Ault says. “And the Challenger taught us that it is very dangerous.”

    To keep their memories alive, the NASA Day of Remembrance ceremony is held every year around the time of the Challenger disaster. This year, it took place on Jan. 22.

    The event serves to memorialize the lives lost not only in the Challenger tragedy, but the seven astronauts who died aboard the Space Shuttle Columbia, which broke up during re-entry on Feb. 1, 2003, and the three astronauts from Apollo 1, who died when a fire broke out in their capsule during preflight testing on Jan. 27, 1967.

    [ad_2]

    Sasha Teman

    Source link

  • How the lessons learned from the Challenger disaster apply to Artemis rockets

    [ad_1]

    NATIONWIDE — As NASA prepares for the wet dress rehearsal of its Artemis II moon rocket and capsule, many are noticing similarities between the cold temperatures this week and how they played a part in the demise of the space shuttle Challenger and its crew 40 years ago.

    However, an expert at Florida Tech explains why the cold weather should not impact Artemis II.


    What You Need To Know

    • A lot of lessons were learned after the Challenger incident
    • Get more space coverage here  ▶
    • 🔻Scroll down to watch interviews with Don Platt, director of Florida Tech’s Spaceport Education Center🔻

    The Artemis II will see NASA’s Cmdr. Gregory Reid Wiseman, pilot Victor Glover, mission specialist Christina Koch and Canadian Space Agency astronaut mission specialist Jeremy Hansen do a flyby of the moon in the Orion spacecraft.

    However, the wet dress rehearsal of Orion and the Space Launch System (SLS) rocket that is currently set for Saturday will see cold temperatures of 40 degrees Fahrenheit (4.4 Celsius).

    Forty years ago on Jan. 28, the space shuttle Challenger blew up 73 seconds after launch, killing its crew. The explosion took the lives of Michael J. Smith, Francis R. “Dick” Scobee, Ronald E. McNair, Ellison S. Onizuka, S. Christa McAuliffe, Gregory B. Jarvis, and Judith A. Resnik.

    The explosion was caused when the O-rings failed at cold temperatures. The rings on the rocket create a seal to prevent exhaust gases from leaking.

    The O-rings were rated to be flown at 39 degrees Fahrenheit (3.9 Celsius) or higher. But when the launch happened at 11:38 a.m. ET, the temperature was at 36 degrees Fahrenheit (2.2 Celsius).

    With the chilly temperatures that are currently sweeping through the Sunshine State, many are worried about Artemis II’s wet dress rehearsal for Saturday and the earliest launch attempt on Friday, Feb. 06.

    However, Don Platt, director of Florida Tech’s Spaceport Education Center, shares how the lessons learned after the Challenger incident were already applied to other shuttle missions, which do impact Artemis II.

    “Well, even in the shuttle program itself, there was about a three-and-a-half-year delay or so, after the Challenger disaster, and so that time was spent reviewing the entire shuttle program, but specifically reviewing these these segment joints that I just talked about and redesigning how the O-rings, these rubber seal material segments fit into that joint. And they added additional redundancy, essentially another layer,” Platt said.

    He continued how these improvements are still being used.

    “Now, of course, you know, after these 40 years, NASA has spent a lot of time looking at ways to improve the joint and materials have, of course, come a long way since the 1980s as well. And so now the the feeling is that the SLS solid rocket booster joints are robust and will not be a major concern at temperatures even down into the 30s and 20s,” Platt shared.

    He explained that with crewed missions, where humans will be on board a spacecraft, extra caution takes place, especially during wet dress rehearsals.

    And this caution goes beyond the SLS rocket and the Orion capsule. It also includes other things.

    [embed]https://www.youtube.com/watch?v=W7XHOPa2x0U[/embed]

    “And all of the components that connect to the rocket to provide propellent into the rocket and to provide electrical power, to make sure that all the interfaces for when the astronauts take the elevator up into the top of the rocket, all of that stuff is working fine and everybody knows exactly what they’re doing,” he said, adding, “You don’t want to have some sort of thing pop up there when they’re actually ready to go and and ready to get into the vehicle and and fly to the moon.”

    In many ways, the uncrewed Artemis I mission in 2022 was a wet dress rehearsal for the Artemis II, Platt said. It was during this test flight of the Orion capsule that an issue with the heat shield was discovered.

    A material called Avcoat that was on the heat shield broke off in chunks during the re-entry phase of Artemis I.

    The Avcoat material is designed to protect a spacecraft from extreme temperatures by burning away as it heats up, instead of sending that heat to the capsule itself.

    However, during re-entry, it broke up into chunks instead of burning away. This issue pushed back the Artemis II and III missions, but NASA has stated it has resolved the problem.

    Platt shared how the Artemis missions will have a profound impact on people.

    [embed]https://www.youtube.com/watch?v=G9jmlwQzsK8[/embed]

    [ad_2] Anthony Leone
    Source link

  • NASA sets date for Artemis II fueling test

    [ad_1]

    KENNEDY SPACE CENTER — NASA has set the date when it will conduct a fueling test for its Artemis II Space Launch System (SLS) rocket and Orion spacecraft that will take four people to the moon.


    What You Need To Know

    • Artemis II will see four astronauts flyby the moon
    • A wet dress rehearsal simulates the launch of the Artemis II moon rocket
    • If an issue is discovered, it may push back the launch

    The U.S. space agency is considering Saturday, Jan. 31, as the earliest date for its wet dress rehearsal, which will simulate the launch of the Artemis II moon rocket.

    “The upcoming wet dress rehearsal is a prelaunch test to fuel the rocket. During the rehearsal, teams demonstrate the ability to load more than 700,000 gallons of cryogenic propellants into the rocket, conduct a launch countdown, and practice safely removing propellant from the rocket without astronauts inside the spacecraft,” stated NASA in a blog.

    There will be several test runs of this simulated launch that will test the Artemis II team’s ability to put a hold on the launch and resume it.

    “The rehearsal will count down to a simulated launch at 9 p.m. EST, but could run to approximately 1 a.m. if needed. The first run will begin approximately 49 hours before launch when launch teams are called to their stations, to 1 minute 30 seconds before launch, followed by a planned three-minute hold and then countdown resumption to 33 seconds before launch — the point at which the rocket’s automatic launch sequencer will control the final seconds of the countdown,” explained NASA.

    If the team detects any issues or anomalies with either the rocket or capsule, the two craft will be rolled from their home on Launch Pad 39B to the Vehicle Assembly Building for work. They were rolled to the launch pad on Saturday, Jan. 17.

    This would also push back the launch if they are rolled back. At the moment, NASA is aiming for a Friday, Feb. 06, launch.

     

    NASA also addressed the cold snap that has attacked the Sunshine State this week.

    “With cold weather sweeping the country and lower than normal temperatures expected in Florida Tuesday, Jan. 27, technicians are taking steps to ensure environmental control systems keeping Orion and SLS elements at the proper conditions are prepared for the cold,” the American space agency stated.

    NASA also revealed that the Artemis II emergency egress system (where baskets will take crew and launch pad personnel from the mobile launcher to the ground) did not work as expected, but has been resolved.

    “… the baskets used to transport the crew and other pad personnel from the mobile launcher in an emergency stopped short of the terminus area located inside the pad perimeter. Since then, the brakes of the system have been adjusted to ensure the baskets fully descend,” NASA commented.

    Artemis II will see four people — NASA’s Cmdr. Gregory Reid Wiseman, pilot Victor Glover, mission specialist Christina Koch and Canadian Space Agency astronaut mission specialist Jeremy Hansen — go to the moon for a flyby mission.

    The first Artemis I mission in 2022, where the uncrewed rocket and capsule were tested, saw a number of delays.

    It was originally expected to launch on Aug. 29, 2022, but a liquid hydrogen leak and temperature issues with the engine forced the first attempt to be scrubbed.

    A second attempt was scrubbed as a separate liquid hydrogen leak was discovered.

    After other issues and two hurricanes, NASA was not able to launch Artemis I until November of that year.

    It is not uncommon for rockets, even established ones like SpaceX’s Falcon 9, to be sent back for repairs or adjustments after testing has shown that issues were detected.

    [ad_2]

    Anthony Leone

    Source link

  • Titusville’s American Space Museum to auction off NASA rocket engine

    [ad_1]

    TITUSVILLE, Fla. — Who wants a NASA rocket engine? Or signed items from astronauts of the Apollo missions? How about a lunar-dust-stained checklist?

    It can all be yours at Titusville’s American Space Museum’s online auction


    What You Need To Know

    • There are a lot of various items up for auction, with many from the Apollo missions

    The online auction started on Sunday, Jan. 25, and it will end on Valentine’s Day.

    One of the items up for bid is a NASA Rocketdyne S-3D rocket engine. This particular engine was not used for any of the early Mercury or Apollo missions. It was used for ballistic missiles.

    Some of the other items include:

    • Things signed by Apollo astronauts
    • Items flown on Apollo missions, like the American flag on the Apollo 15 mission
    • Patches from John Young’s space suit from when he was the command module pilot of Apollo 10
    • An Apollo 17 checklist that is stained with lunar dust, signed by Cmdr. Gene Cernan
    • You can see more items with additional information here

    [ad_2]

    Anthony Leone

    Source link

  • How weather caused the loss of the Space Shuttle Challenger

    [ad_1]

    January 28 marks the 40th anniversary of the loss of the Space Shuttle Challenger and its crew of seven astronauts.

    The disaster rattled the country and was later blamed on the failure of O-rings in one of the solid rocket motors.

    Weather played a major role in the Challenger accident, but it was a factor long before that fateful morning in 1986.


    What You Need To Know

    • Multiple weather events played a role leading up to the disaster
    • Cold temperatures caused issues with the solid rocket motor O-rings
    • Strong winds aloft was the final weather event of the tragedy


    The flight of Mission STS-51L, NASA’s designation for the flight, was a special one. It was known as the “Teacher in Space Mission.” Christa McAuliffe, a schoolteacher from Concord, New Hampshire, would be on the spaceflight. The plan was for her to teach classes from the space shuttle as it orbited the Earth. NASA hoped to spark the interest in space and science with this mission.

    The ship

    The space shuttle selected for the STS-51L flight was the Challenger. At the time, it was the workhorse of the fleet. It had flown more missions than any of the other three shuttles – Columbia, Discovery and Atlantis.

    Bob Self/AP

    Challenger was the second “flight rated” shuttle after Columbia.

    The shuttle made history on multiple flights, including having the first female American astronaut to go into space, Sally Ride, as part of the STS-7 crew in June 1983. Guion Bluford became the first African-American astronaut to fly in space on the STS-8 mission in August 1983. That mission performed the first space shuttle night launch and landing.

    Space Shuttle Challenger, orbiting the Earth, as seen from a camera mounted on the first Shuttle Pallet Satellite. (NASA)

    On the STS-6 mission in April 1983, astronauts did the first spacewalk from a shuttle. The following year in February, the first untethered spacewalk was performed from Challenger, using the Manned Maneuvering Unit (basically a backpack using nitrogen jets for propulsion).

    On its previous flights, Challenger had made almost 1,000 orbits of the Earth and traveled almost 26 million miles during its 62 days in space.

    Associated Press

    This would be Challenger’s 10th mission.

    The crew

    Most of the crew on board were space veterans. Shuttle Commander Francis Scobee had flown on Challenger as a pilot in 1984. Mission Specialist Ronald McNair had also flown on Challenger in 1984. Mission Specialist Judith Resnik had been a crew member on the Space Shuttle Discovery’s first flight in 1984. Mission Specialist Ellison Onizuka had also flown on Discovery in 1985.

    Shuttle Pilot Michael Smith, Mission Specialist Gregory Jarvis and Teacher in Space Christa McAuliffe were all on their first space flights.

    The primary crew for the flight was named a year before the launch on Jan. 27, 1985.

    Problems with the weather

    Before the launch on that cold January morning, there were several instances where weather played a role leading up to the accident.

    The first was when the previous mission, STS-61C, a Space Shuttle Columbia flight, had multiple landing delays while trying to end its mission earlier that January. The weather prevented the orbiter from returning to Earth three times. This led to launch reschedules for Challenger’s flight.

    The next launch reschedule was because of bad weather at the shuttle’s trans-Atlantic abort site at Dakar, Senegal. In the event of an emergency, there were designated runways around the world if the shuttle needed to make an emergency landing after launch.

    The next delay was for weather that never happened. The forecast for January 26 called for “no-go” conditions during the launch window, so NASA officials decided to cancel the planned launch for that day based on the forecast. However, the bad weather never developed and the shuttle could have launched that day.

    All looked “go” for launch on January 27. During orbiter closeout, technicians ran into problems with an exterior hatch handle. By the time they resolved the problem, winds had picked up at Kennedy Space Center and were too strong for an emergency return to launch site abort if necessary.

    Those strong winds were caused by a cold front that would bring freezing temperatures to the launch site the next morning.

    And with that, that stage was set for the events of January 28th.

    Jan. 28

    With the passage of the cold front on Jan. 27, arctic air dropped into Florida, setting record lows across the state. It was this forecast of very cold temperatures that caused concern among scientists and engineers with the space shuttle program.

    The night before the scheduled launch, engineers with Morton-Thiokol, the manufacturer of the shuttle’s solid rocket motors, expressed worries as to how the cold would affect the twin solid rockets attached to either side of the shuttle’s external fuel tank.

    These solid rockets were not one piece, but were segments stacked together to form the rocket. Where the segments came together, rubber O-rings were used to create a tight seal to prevent exhaust gases from leaking at these joints.

    The solid rockets were rated to be flown at temperatures of 39 degrees Fahrenheit and higher. Temperatures at the launch pad were expected to drop in the upper teens by the morning of Jan. 28. At 7 a.m., a temperature of 24 degrees was reported at the shuttle’s launch pad.

    Due to the very cold weather, technicians turned on the launch pad fire suppression system at a low rate to prevent freezing during the night. This, in turn, covered the launch pad with ice. That became yet another concern, since ice could break free at launch and damage the shuttle. Especially vulnerable was the Challenger’s thermal heat shield that protected the shuttle during reentry.

    NASA officials saw the ice buildup on the pad and delayed the launch of Challenger to give the ice time to melt.

    Challenger’s liftoff occurred at 11:38 a.m. The temperature was 36 degrees.

    Just after the solid rocket motors ignited, a small puff of black smoke was seen near the right solid rocket booster (SRB). Hot gases from the rocket had slipped past the O-rings in two of the SRB segments.

    Aluminum oxides from used solid fuel in the rocket resealed the breach and the flight continued.

    All appeared normal as the Challenger climbed into the clear January sky.

    About 37 seconds after launch, the shuttle passed through strong wind shear. These high winds increased aerodynamic pressure on the Challenger. This was the highest wind shear ever encountered on a shuttle flight up to that time.

    The forces caused by the shear, along with other planned maneuvers as the ship flew toward orbit, broke the temporary aluminum oxide seal. Hot exhaust from the leak in the SRB joint then escaped through the hole in the rocket’s casing and began to burn a hole in the large external fuel tank.

    At roughly the 73-second mark after launch, the right SRB triggered the rupture of the external fuel tank. Liquid hydrogen and oxygen ignited, and the explosion enveloped the Challenger.

    Though it has been widely reported that the space shuttle “exploded,” that is not the case. Flying faster than the speed of sound, Challenger was thrown off its flight path when the tank exploded. Aerodynamic forces basically tore the shuttle apart.

    The crew never stood a chance. There was no escape option. At the end of the day, we had lost Challenger and its brave crew.

    The investigation

    The space shuttle program was grounded for more than two years as safety improvements were made; better seals on the SRBs, heaters on those seals, and an escape system for astronauts on the shuttle.

    Looking back at the impact of weather on the accident, you have to wonder: If just one of those instances had not occurred, would Challenger and the crew have made it safely into orbit?

    The cold was the main weather factor on Jan. 28, and if the launch had occurred any day before that very cold morning, the O-ring failure would have likely not occurred.

    If Challenger had not flown through the wind shear after launch, would the aluminum oxide seal have held long enough for SRB separation a little over a minute later?

    Accidents are like a chain; each element is a link. You remove any link and you stop the accident from happening.

    The improvements after the accident did make the shuttles safer, though they were still dangerous. Though NASA makes space flight look easy, it is not. There is a lot of risk.

    Beginning with the “Return to Flight” mission of Discovery in the fall 1988, NASA had many years of successful space shuttle flights until the loss of the Space Shuttle Columbia in February 2003. The loss of Columbia was the beginning of the end of the space shuttle program. Flights continued until the final shuttle flight of Atlantis in July 2011.

    Today, the remaining shuttles – Discovery, Atlantis, Endeavour and Enterprise – are on display around the country.

    Four decades have passed, but Jan. 28 remains a stark reminder of the dangers of space flight and the role that weather can play not only on a space mission, but in our everyday lives as well.

    Follow us on Instagram at spectrumnews1nc for news and other happenings across North Carolina.

    [ad_2]

    Chief Meteorologist Gary Stephenson

    Source link

  • Jeff Bezos’ Blue Origin Launches Satellite Program as Space Data Centers Pick Up Steam

    [ad_1]

    Bezos’ Blue Origin plans a 5,408-satellite TeraWave network to serve enterprises and data centers as space-based computing gains momentum. Alexander Tamargo/Getty Images for America Business Forum

    Jeff Bezos’ space company, Blue Origin, is the latest entrant into the booming satellite internet business. This week, it announced TeraWave, a megaconstellation project promising to deliver data speeds of up to 6 terabits per second (Tbps) anywhere on Earth—technology that could also lay the groundwork for future data centers in space. The move is a strategic addition to another Bezos-backed effort, Amazon’s low-Earth-orbit broadband network Leo (formerly known as Project Kuiper), in a market currently dominated by SpaceX’s Starlink.

    Megaconstellations like these transmit data between Earth and orbiting satellites without cables or cell towers, extending internet access to remote and underserved regions. SpaceX’s Starlink currently operates roughly 9,000 satellites in low-Earth orbit and delivers high-speed internet in more than 150 countries. Blue Origin also faces growing international competition: China is developing two rival megaconstellations, Guowang and Qianfan, which together are expected to include more than 13,000 satellites.

    Unlike Starlink and Leo, however, TeraWave is not aimed at households. Instead, the network will serve “tens of thousands” of enterprises, government agencies and, importantly, data centers, Blue Origin CEO Dave Limp said on X.

    That strategy reflects the surging importance of data centers in the age of A.I. These facilities, which store and process massive volumes of text, images and other data, are straining the world’s power grids as A.I. usage explodes. Space has begun to look like an unconventional solution to that energy crunch. Several aerospace and tech companies are exploring the idea of placing data centers in orbit, where they could draw on near-limitless solar power and radiate heat directly into space.

    Last November, Limp told Yahoo Finance that data centers in space will “for sure” happen in our lifetimes. Google, SpaceX and smaller firms such as Axiom Space and Starcloud have already announced early-stage plans to build or test orbital data storage and computing systems. Space is attractive not only for energy access but also for its lower environmental footprint and the relative ease of scaling compared with building new terrestrial facilities.

    TeraWave joins a growing list of ambitious Blue Origin projects, which includes two lunar landers, a commercial space station and a Mars orbiter. The company has also made progress on New Glenn, its long-delayed reusable heavy-lift rocket designed to deploy satellites into low-Earth orbit—including Amazon’s Leo constellation and, potentially, TeraWave itself.

    For now, Amazon Leo depends on other launch providers. Since last April, the project has sent 180 satellites into orbit using rockets from United Launch Alliance and SpaceX. Under existing agreements, Blue Origin is expected to handle between 12 and 27 future Leo launches as part of the effort to build out a roughly 3,200-satellite network. Those flights hinge on the reliability of New Glenn, which is still in the testing phase.

    Bezos, who founded Blue Origin in 2000, has long said the company could eventually eclipse Amazon. “I think it’s going to be the best business that I’ve ever been involved in, but it’s going to take a while,” he said in 2024.

    Blue Origin plans to begin deploying TeraWave satellites in the fourth quarter of 2027. The constellation will consist of 5,408 optically interconnected satellites, most of them operating in low-Earth orbit, forming a high-speed network designed to serve the next generation of cloud computing and space-based infrastructure.

    Jeff Bezos’ Blue Origin Launches Satellite Program as Space Data Centers Pick Up Steam

    [ad_2]

    Colette Holcomb

    Source link

  • SpaceX’s launch of U.S. Space Force GPS satellite pushed back

    [ad_1]

    CAPE CANAVERAL SPACE FORCE STATION — SpaceX’s launch of a U.S. Space Force GPS satellite has been pushed back. 


    What You Need To Know

    • The Falcon 9 rocket will send up GPS III-9 mission

    The Falcon 9 rocket will send up GPS III-9 mission from Space Launch Complex 40 at Cape Canaveral Space Force Station, stated SpaceX

    The launch window will open at 11:34 p.m. ET, Monday, and close at 12:09 a.m. ET on Tuesday. 

    So, SpaceX needs to launch this satellite during that timeframe.

    It was originally going to launch at those times on Sunday going into Monday.

    There has been no word as to why the launch has been pushed back. 

    If the launch is scrubbed, the next attempt will be at 11:38 p.m. ET, Tuesday, stated SpaceX.

    Find out more about the weather criteria for a Falcon 9 launch.

    Taking the fifth

    This will be the fifth mission for the Falcon 9’s first-stage booster B1096.

    It has experience launching all types of satellites.

    After the stage separation, the first-stage rocket will land on the droneship A Shortfall of Gravitas that will be in the Atlantic Ocean.

    About the mission

    The satellite, officially called Global Positioning System (GPS) III Space Vehicle (SV)09, is named in honor of Col. Ellison Onizuka, who was a U.S. Air Force test pilot and a mission specialist on the space shuttle Challenger mission that blew up, stated the U.S. Space Force.

    On Thursday, NASA held a Day of Remembrance for fallen astronauts.

    The U.S. Space Force shared the following about the satellite.

    “GPS III satellites, equipped with M-Code technology, provide the warfighter with a significantly more accurate and jam-resistant capability. Adding another such satellite to the constellation enhances the system’s robustness and ultimately boosts the warfighting lethality of the Joint Force,” it stated.

    [ad_2]

    Anthony Leone

    Source link

  • NASA Day of Remembrance solemn time to reflect on lost astronauts

    [ad_1]

    KENNEDY SPACE CENTER — Hundreds gather underneath the space shuttle Atlantis attraction at the Kennedy Space Center Visitor Complex on Thursday, as NASA paid tribute to the 17 astronauts who were killed in three separate tragedies over the years.


    What You Need To Know

    • Family members came to honor their loved ones
    • A ceremony was held where their memories and service to our country in America’s pursuit of space exploration were honored
    • Get more space coverage here  ▶
    • 🔻Scroll down to see the photo gallery🔻

    A ceremony was held where their memories and service to our country in America’s pursuit of space exploration were honored.

    Reflecting on who was lost, and why most believe the country should continue reaching for the stars.

    Twenty-five astronauts and test pilots have died since the U.S. space program began in 1958.

    Three tragic accidents happened over the decades.

    The Apollo 1 launch pad fire killed three astronauts, Roger Chaffee, Virgil ‘Gus’ Grissom and Edward White II on Jan. 27, 1967, at then Cape Canaveral Air Force Station. It has since been renamed the Cape Canaveral Space Force Station.

    The crew of the space shuttle Challenger were killed when the orbiter broke apart 73 seconds after liftoff from Kennedy Space Center on Jan. 28, 1986.

    Dick Scobee, Michael Smith, Ronald McNair, Ellison Onizuka, Gregory Jarvis, Judith Resnick and teacher Christa McAuliffe perished.

    On Feb. 1, 2003, the space shuttle Columbia accident claimed the lives of the seven-member crew: Cmdr. Rick Husband, pilot William McCool, mission specialists Kalpana Chawla, Laurel Clark, Michael Anderson, David Brown and payload specialist Ilan Ramon.

    The orbiter was destroyed over Texas on its way home.

    Alison Smith Balch is the daughter of space shuttle Challenger crew member Michael Smith.

    Forty years later, Smith Balch, her family and others, were here to honor their sacrifice so many years ago.

    “It’s great that our family members are remembered. The way they died was unique because so many people truly are part of the story that was that day,” she told Spectrum News.

    “Daily, daily, it doesn’t go away, he doesn’t go away, he’s still in my heart always, has always been, many, many years,” says Jane Smith Walcott, Smith’s widow.

    Family laid a wreath at the Astronauts Memorial Foundation’s Space Mirror Memorial, which is emblazoned with the names of those who gave the ultimate sacrifice.

    Guests placed flowers in honor of the heroes who died to help further America’s exploration of space.

    A somber day as the U.S. presses on to return to the moon once again and, eventually, to Mars.

    [ad_2]

    Greg Pallone

    Source link

  • Blue Origin launches New Shepard NS-38 manned mission

    [ad_1]

    TEXAS — After a couple of delays, including unauthorized people on the launch site, Blue Origin sent up six people on its New Shepard rocket.


    What You Need To Know

    • The six are part of the NS-38 mission

    The six are part of the NS-38 mission, Blue Origin’s crewed mission, which took off at 11:25 a.m. ET from Launch Site One in West Texas, stated the Washington-state company.

    All six climbed onboard the R.S.S. First Step spacecraft, and after the launch and stage separation happened, they experienced zero gravity for a couple of minutes before returning to Earth as three parachutes deployed.

    But before the launch, there was a hold while security was collecting people who were not authorized to be on the range. 

    “We are at a hold at just under 3 minutes until launch. We do have an update for you, and that is that there are unauthorized personnel on the range. Our security is currently working to clear that and then we will have NS-38 ready to go across the Karman line,” said Tabitha Lipkin, senior content producer at Blue Origin, during the livestream.

    They traveled beyond the Kármán line, the internationally established edge of space at 62 miles/100 kilometers above Earth’s surface.

    Just like SpaceX rockets, the New Shepard is designed to land autonomously, and the booster touched down on a landing pad.

    Before the stage separation, the rocket booster was going about 2,000 mph/3,218 kph.

    Meeting the crew

    The crew was made up of Tim Drexler, Linda Edwards, Alain Fernandez, Alberto Gutiérrez, Jim Hendren, and Dr. Laura Stiles, Blue Origin’s director of New Shepard Launch Operations.

    Andrew Yaffe was originally going to be part of the launch, but had to back out, according to Blue Origin.

    “Blue Origin today announced that one of our NS-38 crew members is no longer able to fly due to illness and will fly on a future mission,” Blue Origin stated on Tuesday.

    Once back on the ground, Stiles said through tears that it was an incredible experience to witness the Earth and moon from space.

    You can learn more about the crew right here.

    [ad_2]

    Anthony Leone

    Source link

  • Crew-11 avoids details of medical episode that cut mission short

    [ad_1]

    JOHSON SPACE CENTER — During a Wednesday afternoon press conference, the Crew-11 members talked about some of their experiments, but the focus was on the unnamed astronaut who had an unknown medical issue that cut the mission short by a month.


    What You Need To Know

    • Crew-11 and NASA would not identify the astronaut or what the medical issue was.

    “Just to start off, of course, we are back here a little earlier than we were expecting. And just to say up front, we are not going to be identifying the crew member or talking through the differential or any of the details of the medical situation. Thank you so much for respecting our privacy,” Cmdr. Zena Cardman said to the media at the start of the press conference.

    She and fellow NASA astronaut and pilot Michael Fincke, and mission specialists Japan Aerospace Exploration Agency (JAXA) astronaut Kimiya Yui and Roscosmos cosmonaut Oleg Platonov spoke about some of the work they did.

    Almost a week ago, on Thursday, the quartet splashed down in the first medical evacuation in the International Space Station’s 25 years of full service.

    The health episode, which NASA Administrator Jared Isaacman called a “serious medical condition” last week, caused the U.S. space agency to cut the Crew-11 mission short.

    It was set to end in February. The astronauts spent five months on the space station after they were launched on a SpaceX Falcon 9 rocket in August 2025.

    The medical episode happened the day before a scheduled six-hour spacewalk, where Fincke and Cardman were going to install a modification kit and cables for a future rollout of a solar array on Thursday, Jan. 08.

    Officials stated this was not an emergency de-orbit.

    During a question-and-answer session, Cardman called the shortened mission an “unexpected timeline.”

    “I hope to go back to the ISS for so many reasons. It’s just an incredible experience and I think even though we had an unexpected timeline, there’s so much that we are proud of and so much we did accomplish,” she told Spectrum News.

    But she said that their training served them well during the medical event.

    “As far as things we would do differently, I am very proud to say that we were as well prepared as we possibly could be, and that’s thanks to a lot of really excellent training that we get on the ground. And just being up there with really excellent operators and people who come together as a team really goes a long way. And that’s the crew on orbit as well as our ground support teams,” Cardman explained to Spectrum News.

    She highlighted the research that they conducted and how a lot of cargo came and went from the floating laboratory.

    In a question from another member of the press, Fincke revealed that the International Space Station’s ultrasound equipment was used during the medical episode.

    “And having a portable ultrasound machine helped us in this situation. … So, when we had this emergency, the ultrasound machine came in super handy. So, I’d recommend a portable ultrasound machine in the future for sure, for all space flights. It really helped,” he said.

    In a separate news article, Dr. Emmanuel Urquieta, vice chairman of the University of Central Florida’s Aerospace Medicine and associate professor of medicine, shared how each mission on the space station has an astronaut who is assigned as a crew medical officer.

    He went into detail about the type of training and medical equipment.

    Despite everything that has happened, Fincke said that even though Crew-11 will not be on the space station when Crew-12 arrives, they will still share greetings and advice on Earth.

    “Yeah, we wouldn’t want Crew-12 to hit the ground running or hit the space floating, something like that,” he said, adding, “I think my only advice to them, just as we did with  the change of command ceremony, was take time and stop for a group hug.”

    With Cardman chiming in, “Group hugs and selfies.”

    [ad_2]

    Anthony Leone

    Source link

  • Northern lights could be visible for parts of the country on Monday night

    [ad_1]

    The northern lights could be visible across parts of the country tonight. A coronal mass ejection (CME) will likely arrive at Earth tonight, leading to elevated geomagnetic activity.

    Geomagnetic storms are responsible for the visual display of the northern lights, or aurora borealis.


    What You Need To Know

    • A Geomagnetic Storm Watch is in effect
    • The northern lights may be visible for parts of the U.S.
    • The Aurora Borealis is typically linked to winter viewings but can actually be seen all year


    A CME is an eruption of solar material and magnetic fields. There is a Geomagnetic Storm Watch in effect tonight, with a G4 predicted. According to NOAA’s Space Weather Prediction Center, watches at this level are very rare.


    Aurora Borealis

    The sun is currently in an upswing of its 11-year solar cycle. Scientists notice more sunspots as they migrate toward the equator of the sun, and when their magnetic fields tangle, solar storms erupt.

    Earth’s magnetic field acts as a buffer to keep particles and energy ejected from the sun at bay. However, if the solar storm is strong enough, those particles can penetrate the Earth’s atmosphere, giving off light, creating the auroras we see.

    With such intense CMEs expected to arrive on Earth, the severe storm might make the northern lights visible in the northern U.S., with the best chance of viewing at higher latitudes. 

    Geomagnetic storms

    The energy from a solar storm is categorized by G levels. Tonight’s aurora forecast is a G4.

    (NOAA Space Weather Prediction Center)

    G1 would show a minor storm, G2 a moderate storm, G3 a strong storm, G4 a severe storm and G5 would mean an extreme storm.

    While these storms make the northern lights brighter and more visible in lower latitudes, the energy entering our atmosphere can cause disruptions to power grids, spacecraft operations and migratory animals.

    The U.S. National Oceanic and Atmospheric Administration’s (NOAA) Space Weather Prediction Center (SWPC) uses a planetary k index, which goes from 0 to 9, to predict the visibility of the northern lights around the world. The higher the Kp values, the further south people can view the aurora.

    A Kp value of 8 is forecast for Monday night. 

    How to see and capture the auroras

    For the latest northern lights forecasts, check NOAA’s Space Weather Prediction Center website or an aurora forecasting app.

    Make your best effort to get away from city lights and find somewhere dark. Experts recommend skygazing from a local or national park. And check the weather forecast because clouds can cover up the spectacle entirely.

    Many areas in northern latitudes should be able to see the northern lights with the naked eye. If you’re farther south, your smartphone cameras may also reveal hints of the aurora that aren’t visible to the naked eye. Long-exposure is your best bet to reveal all the colors in the night sky.

    When taking the photo, turn on “night mode” and place your phone on a steady surface. The longer the exposure, the better the photo will turn out!

    If you’ve taken any pictures of the northern lights, you can share your photos here.

    Our team of meteorologists dives deep into the science of weather and breaks down timely weather data and information. To view more weather and climate stories, check out our weather blogs section.

    [ad_2]

    Spectrum News Weather Staff

    Source link

  • NASA hauls Artemis II moon rocket to launch pad for February flight

    [ad_1]

    After months of meticulous preparation, NASA’s 32-story-tall Space Launch System rocket, the most powerful operational booster in the world, was hauled to its seaside launch pad Saturday in Florida, setting the stage for a long-awaited flight next month to send four astronauts on a trip around the moon.

    The 5.7-million-pound rocket, carried by an upgraded Apollo-era crawler-transporter tipping the scales at some six million pounds, began the trip to pad 39B just after 7 a.m. local time, creeping out of NASA‘s cavernous Vehicle Assembly Building at a top speed of just under 1 mile per hour.

    The Space Launch System rocket, with NASA’s Orion crew capsule perched on top, was hauled out of the huge Vehicle Assembly Building at the Kennedy Space Center early Saturday for a 4-mile trip to launch pad 39B. If all goes well, NASA plans to launch the rocket in early February to send four astronauts on a trip around the moon and back.

    William Harwood/CBS News


    Hundreds of space center workers, family members and guests gathered near the VAB and along the crawlerway to take in the sight, posing for selfies and enjoying a chilly Saturday morning as the towering moon rocket slowly rolled past.

    New NASA Administrator Jared Isaacman and the Artemis II astronauts — Cmdr. Reid Wiseman, Victor Glover, Christina Koch and Canadian astronaut Jeremy Hansen — were also on hand to witness the milestone.

    “Wow. LETS GO!!!” Wiseman posted on the social media platform X with a photo of the SLS rocket moving out of the VAB. In another post, he called the SLS and its Orion crew capsule “engineering art.”

    Generating some 8.8 million pounds of thrust at liftoff, the SLS is the most powerful rocket ever operated by NASA, including the agency’s legendary Saturn 5 moon rocket. It has a little more than half the thrust of SpaceX’s Super Heavy-Starship rocket, but after a successful unpiloted test flight in 2022 — Artemis I — NASA deemed it safe enough to put astronauts aboard.

    The SpaceX rocket is still in the test phase, and it’s not known when it might make its first flight with people on board.

    10fcdc8c-1381-4bab-aa0f-cbca67813cfe.jpg

    NASA Administrator Jared Isaacman and the Artemis II crew take questions from reporters during the SLS rollout to the launch pad. Left to right: NASA Press Secretary Bethany Stevens, Isaacman, Canadian astronaut Jeremy Hansen, Christina Koch, Victor Glover and Artemis II commander Reid Wiseman.

    NASA


    The Artemis II crew plans to blast off in early February to test drive their Orion crew capsule in Earth orbit before heading into deep space on a flight around the moon that will carry them farther from Earth than any astronauts have ever ventured. In the process, they will get a chance to observe the far side of the moon in some detail.

    “I think one of the most magical things for me in this experience is when I looked out a few mornings ago, there was a beautiful crescent (moon) in the morning sunrise, and I truly just see the far side,” Wiseman told reporters during the SLS rollout. “It was a waning crescent here, so it’s a waxing gibbous on the far side.”

    He added: “And you just think about all the landmarks we’ve been studying on that far side, and how amazing that will look, and seeing Earth rise, those sorts of things, just flipping the moon over and seeing it from the other perspective is what I think when I look out (at the moon) right now.”

    The trip to launch pad 39B took about eight hours, kicking off a busy few weeks of tightly scripted tests and checkouts before a critical fueling test around Feb. 2 when nearly 800,000 gallons of super cold liquid hydrogen and oxygen will be pumped aboard for a “wet” dress rehearsal countdown.

    “One of the first things that happens after we get to the pad, we get connected … all the validations, getting tied back to the firing room, getting ready to power up the individual elements,” said launch director Charlie Blackwell-Thompson. “We will get into our crew module work (and) we’re going to power everything up.”

    Blackwell-Thompson added: “We have incrementally tested all of this offline or in the integrated environment of the VAB and now it’s just getting out to the pad and testing those pad interfaces. … Wet dress is the big test at the pad. That’s the one to keep an eye on, I guess, that’s the driver to launch.”

    011726-onpad-2.jpg

    The Artemis II Space Launch System rocket reached the top of pad 39B after a 4-mile trip from NASA’s Vehicle Assembly Building that took about eight hours to complete. NASA hopes to launch the rocket in early February to send four astronauts on a flight around the moon.

    CBS News


    The maiden flight of the SLS rocket in 2022 was delayed multiple times by propellant loading problems and persistent hydrogen leaks. For the rocket’s second flight, NASA and its contractor team have implemented multiple upgrades and procedural changes to minimize or eliminate any such problems the second time around.

    “Artemis I was a test flight, and we learned a lot during that campaign getting to launch,” said Blackwell-Thompson. “And the things that we learned relative to how to go load this vehicle, how to load (liquid oxygen), how to load hydrogen, have all been rolled into the way in which we intend to load the Artemis II vehicle.”

    Because of the relative positions of the Earth and moon, along with the trajectory NASA plans to use for Artemis II, the agency only has five launch opportunities in February: Feb. 6, 7, 8, 10 and 11. Because rollout came a few days later than planned, pushing the fueling test into early February, it would appear only the final three opportunities are still available.

    But a leak-free fueling test, in the absence of any other major issues, will clear the way for a launch attempt on one or two of those days. If not, the next set of launch windows opens in March.

    A wild card in the mission planning is the launch of a fresh crew to the International Space Station to replace four crew members who returned to Earth ahead of schedule Thursday because of a medical issue affecting one of the astronauts. That launch originally was scheduled for Feb. 15, but NASA managers are looking into moving it up by several days to minimize the gap between crews.

    NASA flight controllers want to avoid flying two piloted spacecraft at the same time. If the space station crew replacement flight stays on track, or if problems are found during the SLS fueling test, agency managers might be forced to delay the Artemis II launch to the next set of opportunities in March.

    But Isaacman is keeping NASA’s options open.

    “We have, I think, zero intention of communicating an actual launch date until we get through wet dress,” he said. “But look, that’s our first window, and if everything is tracking accordingly, I know the teams are prepared, I know this crew is prepared. We’ll take it.”

    [ad_2]

    Source link

  • NASA rolls out SLS rocket for Artemis II moon mission

    [ad_1]

    KENNEDY SPACE CENTER —  More than 1,000 people came out to see NASA roll out its Artemis II Space Launch System (SLS) rocket as it made its slow march to the launch pad during the chilly early morning hours on Saturday.  


    What You Need To Know

    • The SLS is a super-heavy rocket that is 322 feet tall (98.27 meters)
    • The Artemis II mission will see four humans flying by the moon
    • It will begin its slow 4-mile ground journey from the Vehicle Assembly Building to Launch Pad 39B at NASA’s Kennedy Space Center

    The SLS is a super-heavy rocket that is 322 feet tall (98.27 meters), making it 17 feet (5.18 meters) taller than the Statue of Liberty, according to NASA.

    To put it into perspective for space lovers:

    At 7 a.m. ET., the SLS rocket and Orion capsule took a ride on a crawler transporter as it began its slow 4-mile ground journey from the Vehicle Assembly Building to Launch Pad 39B at NASA’s Kennedy Space Center.

    And yes, it was a slow trip, moving at 1 mile per hour or less. Between unscheduled stops and other factors, it could take between six and 12 hours before it arrives at the launch pad — its home until the planned February 2026 launch. 

    Once it arrives at its temporary home, it will have its wet dress rehearsal, which is scheduled to take place either at the end of January or the start of February.

    The purpose of the wet dress rehearsal is to test each phase of the launch countdown, from loading more than 700,000 gallons of super-cold fuel into the rocket to safely standing down from a liftoff attempt.  

    And that fuel isn’t something you can find at your local gas station.

    “The liquid oxygen tank and liquid hydrogen tank hold a combined 733,000 gallons of propellant super cooled to minus 423 degrees Fahrenheit to power the four RS-25 engines at the bottom of the rocket,” NASA explained.

    Sitting on top of the SLS rocket is the Orion capsule, which will carry its human crew to their 10-day mission to the moon.

    It will send NASA’s Cmdr. Gregory Reid Wiseman, pilot Victor Glover, mission specialist Christina Koch and Canadian Space Agency astronaut mission specialist Jeremy Hansen to the moon, the first time humans visited the rocky satellite since 1972.

    Glover will be the first Black man and Koch will be the first woman to fly to the moon. 

    During a press conference on Saturday morning, the four shared a stage with NASA Administrator Jared Isaacman.

    Isaacman said that the Artemis II mission will fulfill more than one promise.

    “Why are we doing this? We are doing this to fulfill a promise, promise to the American people that we will return to the moon, a promise to all of the pioneers, the engineers, the scientists, the astronauts, the researchers from the 1960s, which the laid the foundation that we are that we are standing upon right now. We’ll do it inevitably to figure out the orbital and lunar economy for all of the science and discovery possibilities that are out there to inspire my kids, your kids, kids all around the world to want to grow up and contribute to this unbelievable endeavor that we’re on right now,” he said.

    Koch also echoed some of what Isaacman said, as well as adding some of the things the mission will focus on.

    “One of the reasons that these missions are so important is the discovery and the knowledge that we bring back to Earth, and that is the entire point. We have both lunar geology science, and we have human research on this mission. Human research is that we’re participating in everything from how we can top perform behavioral health, immune response in space, which is a fascinating physiological response that humans have to microgravity,” she said.

    During the press conference, Hansen said that America’s exploration of space has paved the way for other countries, such as Canada, to develop their own skills.

    “I’ve really applauded the American space leadership because they carved out space for Canada to hone some of our skills, to develop workforce in specific areas, and to bring that knowledge. And the future for Canada kind of looks like where the international collaboration wants to go. We aren’t leading that collaboration. NASA is leading that collaboration, inviting our participation. We have skill sets, and I know Canada will rise to the challenge, just like they did in the Artemis. When we were asked to join Artemis, we started to lean into developing new robotic systems for deep space,” he said.

    While discussing how close they have become, Wiseman also shared that they will have the easiest job on launch day.

    “While we’re up there on launch day, we’ve got the easiest job. We really have the easiest job. We’ve trained for this. We know exactly what to do and it will be good. It’s our families that we think about the most on launch day,” he said.

    This will be a flyby mission, as seen in this NASA graphic for Artemis II.

    NASA is aiming for a Feb. 6 launch, but it can be pushed back to April. The U.S. space agency explained why.

    “While the Artemis II launch window opens as early as Friday, Feb. 6, the mission management team will assess flight readiness after the wet dress rehearsal across the spacecraft, launch infrastructure, and the crew and operations teams before selecting a launch date,” NASA stated.

    As John Honeycutt, NASA’s Artemis II mission management team chair, said during a Friday afternoon press conference, “We will fly when we are ready.”

    The U.S. space agency has named the mission to return to Earth’s lunar neighbor Artemis, as a homage to the Apollo moon landing. In Greek mythology, Artemis is the twin sister of Apollo and the goddess of the moon.

    NASA plans to send humans (including the first woman and person of color) back to the moon in 2027, more than 50 years after the last time humans stepped on the lunar surface.

    The Artemis I launch took place in 2022 to test out the new systems and how they would handle going to the moon and back.

    Learn about the crew

    [ad_2]

    Anthony Leone

    Source link

  • NASA juggling piloted moon mission and space station crew replacement flight

    [ad_1]

    With a space station medical evacuation safely completed, NASA is focused on two challenging missions proceeding in parallel: launching four astronauts on a flight around the moon, at the same time as the agency is planning to send four replacement astronauts to the International Space Station.

    Engineers plan to haul the Artemis 2 moon rocket to launch pad 39B at the Kennedy Space Center on Saturday for tests leading to launch early next month on a historic piloted flight around the moon.

    The Space Launch System moon rocket inside NASA’s Vehicle Assembly Building where engineers are removing work platforms to clear the way for rollout to launch pad 39B on Saturday. Four astronauts in the Orion crew capsule at the top of the rocket plan to fly around the moon in early February.

    NASA/Keegan Barber


    At the same time, NASA is gearing up to launch four Crew 12 astronauts to the space station, possibly while the Artemis 2 moon mission is underway, to replace four Crew 11 crew members who cut their mission short and returned to Earth ahead of schedule Thursday because of a medical issue.

    The Artemis 2 mission and Crew 12’s planned space station flight present a unique challenge for NASA. The agency has not managed two piloted spacecraft at the same time since a pair of two-man Gemini capsules tested rendezvous procedures in low-Earth orbit in 1965. The agency has never flown a deep space mission amid another launch to Earth orbit.

    “This is exactly what we should be doing at NASA,” Jared Isaacman, NASA’s new administrator, said Thursday. “We have the means as an agency … to be able to bring our astronauts home at any time … while making preparations to pull forward our next mission, like Crew 12, while also progressing on our Artemis 2 campaign.”

    He described the moon mission as “probably one of the most important human spaceflight missions in the last half century.”

    The world’s most powerful rocket booster

    NASA’s towering 322-foot-tall Space Launch System rocket, the most powerful operational booster in the world, will be hauled out of the cavernous Vehicle Assembly Building early Saturday atop an upgraded Apollo-era crawler transporter. Including at least one stop along the way, the 4-mile move to the pad is expected to take eight to 10 hours.

    “It takes us a little while to get out of the building,” said Launch Director Charlie Blackwell-Thompson. “But about an hour after we get that first motion, you’ll begin to see that beautiful vehicle cross over the threshold of the VAB and come outside for the world to have a look.”

    Once at the pad, engineers will carry out a variety of tests and work to ready the rocket and its Orion crew capsule for blastoff early next month on the Artemis 2 moon mission.

    “It really doesn’t get much better than this,” John Honeycutt, chairman of the Artemis 2 Mission Management Team, told reporters Friday. “We’re making history.”

    Commander Reid Wiseman, Victor Glover, Christina Koch and Canadian astronaut Jeremy Hansen planned to be on hand for the rollout. If all goes well, the crew will test the Orion capsule in Earth orbit before heading into deep space, flying farther from home than any other humans as they loop around the far side of the moon.

    Artemis 2 mission plan

    The Artemis 2 mission follows a similar flight in 2022 that sent an unpiloted Orion capsule around the moon to pave the way for next month’s flight. The Artemis 2 mission, in turn, will set the stage for Artemis 3, a long-awaited and oft-delayed mission to land astronauts near the moon’s south pole. The current target date for Artemis 3 is 2028.

    Despite Saturday’s planned rollout, the Artemis 2 launch date is still uncertain.

    It will depend in large part on the results of a fueling test around the first of the month when engineers plan to load the booster’s 21-story-tall first stage with 733,000 gallons of super-cold liquid hydrogen and oxygen along with a full load of propellants for the booster’s 45-foot-tall second stage, the Interim Cryogenic Propulsion Stage, or ICPS.

    crew-whiteroom.jpg

    The Artemis 2 crew (left to right): commander Reid Wiseman, Victor Glover, Christina Koch and Canadian astronaut Jeremy Hansen.

    NASA/Frank Michaux


    During tests of the SLS rocket used for the Artemis 1 mission in 2022, multiple fueling tests had to be carried out before engineers finally resolved a series of propellant leaks. The SLS rolling out on Saturday features multiple upgrades and improvements to minimize or eliminate any such leakage.

    If the upcoming fueling test goes well, Wiseman and his crewmates could be cleared to blast off a few days before Feb. 11, the end of next month’s launch period. If any major problems are found during the propellant loading exercise, Artemis 2 likely will slip to early March when the next set of launch windows becomes available.

    Next space station crew

    Amid the work to ready the Artemis 2 rocket for launch, NASA managers are also working to move up the launch of the Crew 12 space station crew. Commander Jessica Meir, Jack Hathaway, European Space Agency Sophie Adenot and cosmonaut Andrey Fedyaev are officially scheduled for launch on Feb. 15.

    The crew they are replacing, Crew 11 commander Zena Cardman, Mike Fincke, Japanese astronaut Kimiya Yui and cosmonaut Oleg Platonov, originally expected to return to Earth around Feb. 20 after helping familiarize their replacements with the intricacies of space station operation.

    011526-crew11-in-cabin-post-splashdown.jpg

    Four space station crewmates returned to Earth Thursday after their mission was cut short due to a medical issue. The Crew 11 crew members are seen here shortly after splashdown, before they left their Crew Dragon capsule (left to right): cosmonaut Oleg Platonov, NASA astronaut Mike Fincke, mission commander Zena Cardman and Japanese astronaut Kimiya Yui. (NASA)

    NASA/Bill Ingalls


    But Crew 11 was ordered to cut their mission short after one of the crew members developed a medical issue of some sort. They returned to Earth Thursday, leaving just three people aboard the space station: cosmonaut Sergey Kud-Sverchkov, Sergey Mikaev and NASA astronaut Chris Williams. They were launched to the outpost in November aboard a Russian Soyuz spacecraft.

    NASA and SpaceX are working to move up the Crew 12 launch date to minimize the gap between the two NASA missions. Depending on where it ends up, NASA could be orchestrating a launch to the International Space Station while the Artemis 2 crew is flying around the moon.

    “I don’t see any reason why we wouldn’t continue along those parallel paths,” Isaacman said. “And if it comes down to a point in time where we have to de-conflict between two human spaceflight missions, that is a very good problem to have at NASA.”

    Jeff Radigan, lead flight director for Artemis 2, agreed it made sense to continue preparing for both missions.

    “I know the agency is preparing to launch Crew 12,” he told reporters. “There are a lot of preparations going on, but there absolutely are constraints.”

    “It’s not prudent for us to put both of those up at the same time, but we also have to ensure that both of them are ready to go. We may run into an issue, and the last thing we want to do is make a decision too early and then lose an opportunity. That would not be responsible of us.

    “So, we need to keep pressing with both missions, we need to ensure that we’re doing that at the right speed, and we’re looking at the right technical constraints. As we get closer, either the decision will come about because the hardware’s talking to us and we have an issue that we have to go deal with, or we have to pick one.”

    But, he added, “that doesn’t mean we should stop preparing for either mission right now, but we need to do that at the right pace.”

    [ad_2]

    Source link